Invest in the Future of Sustainable Gold Mining
Get Investment Deck
While GoldFinX has operated in the small-scale mining space for over 5 years and has made its mark as one of the first to innovate with Mercury-Free operations, a new opportunity is emerging in Côte d’Ivoire:
Mid-Sized Mining (5-15 sq km surface area).

The Ivory Coast’s new mining laws expand mid-scale operations across larger territories, enabling investment in advanced extraction tech and higher productivity.

Expanded Surface Ownership
Ownership of larger surface area permits, which allows for a higher extractive capital allocation than a 1 sq km permit (10 times the territory).
_converted.avif)
Enhanced Depth Capability
Standard depth increases for pursuing hard-rock structures up to 100m below the surface, allowing access to deeper mineral deposits and improved exploration potential.

Inter-Site Ore Transportation
Ore transport between sites, enabling seamless movement of extracted materials between multiple operational areas, reducing transportation time and cost.
GOLDFINX has established a strong track record in small-scale mining, and now the addition of new mid-scale mining permits brings immense potential at a pivotal moment.
Having anticipated this regulatory change, GOLDFINX is poised to develop three high-mineralization sites.

This cutting-edge portable center increases gold output, improves extraction efficiency, and ensures mercury-free operations.

Advanced Equipment Integration
Hi-tech equipment integrated into a streamlined production capacity for higher processing volumes.

Enhanced Extraction Efficiency
Allows for a higher extraction rate of gold from ore (>70%), improving overall yield and resource utilisation.

Centralised Processing Excellence
Centralised treatment centre allows for more sophisticated technologies, stability, consistency and security.

Optimised Operations & Profitability
Higher profitability, more efficient ops management and supervision, leading to optimized resource allocation.

Mercury-Free
Process
Cleaner processes protect workers' health and the environment while yielding higher gold recovery rates.
- Justifies higher capital investment into earth - moving equipment and a centralised treatment centre.
- Higher continuous captive resource (alluvial trails).
- Increased number of potential rock structures with worthwhile anomalies (1 sq km vs 10+ sq km).
- Overall production risk reduction due to larger explorable surface areas in known gold-rich hot spots.
- More meaningful community outreach & relationships due to longer time frame of projects (5yr+).
- Longer period to amortise the cost of staging-upstaging and rehabilitation, considering the 5 to 10 times larger operational territory to extract from.

From This
To This


Grow into a B2Gold or IAMGOLD-sized operator specialising in West African gold extraction and processing.
$3.6M
Seeking $3.6M senior loan, first-lien on plant & machinery.
12 Months
12-Month grace period
24 Months
24-month repayment at 10% interest + 12% monthly NSR.
$15.57M
5-year approx. payout to investor = 15.57M (incl. $3.6M principal).
332%
Estimated total return
.png)
